Yale Social Sciences Academic Building

Client: Yale University

Contract Value: N/A

  • Relocated 1,600 l.f. of high pressure steam and chilled water lines
  • Formed and poured 675 s.f. steam vault
  • Excavated, formed and poured 1,300 l.f. of electrical and telecom ductbank
  • Set three precast steam, telecom, and electric vaults
  • Installed 13,000 s.f. of soldier pile and lagging
  • 19,250 c.y. of structure excavation
  • Installed new utility infrastructure (potable water, fire service, storm and sanitary piping, and electrical and telecom duct banks)
  • Connected the site to the existing utility grid while maintaining vehicle and pedestrian access through the local streets